The shared inbox

The inbox is where crew replies land. When someone texts back — "running 10 late", "which gate?", a thumbs-up — the whole office sees it in one place, matched to the crew member, and anyone on the team can answer from CrewSheet.

Sending the schedule still works the way it always has: crew don't have to reply or confirm. The inbox is for the replies that do come in.

Who can use it

Admins and schedulers see Inbox in the left navigation. It's one shared inbox for the whole organization, not one per person or per division, so a reply answered by one scheduler is handled for everyone.

The three tabs

  • Awaiting response — conversations where the crew member sent the last message and nobody has dealt with it yet. This is your to-do list.
  • Everything else — conversations where you sent the last message, or where you marked the reply as read.
  • Not interested — people who texted STOP or who you marked as not interested.

Selecting a tab opens the first conversation in it.

A conversation shows up once the crew member has replied at least once. People you've only texted, who have never written back, don't appear.

Read a conversation

Each row in the list shows who it's from, when the last message arrived, and the start of that message. Messages you sent are prefixed with You:.

CrewSheet matches the phone number to your crew list, so you see the crew member's name and role instead of a bare number. A number that isn't on your crew list shows as the phone number. If two crew members share a number, the row is flagged with a matches badge so you know to check who it really is.

Click a row to open the conversation on the right. Messages read top to bottom with the newest at the bottom; yours are on the right, the crew member's on the left. Use View crew in the header to jump to that person's crew record.

Reply

Type in the box at the bottom and click Send, or press Enter. Use Shift+Enter for a new line.

Your reply goes out as a text from your company's number, and the conversation moves to Everything else.

Mark as read

Not every reply needs an answer. When the latest message is from the crew member, the header shows Mark as read. Click it to clear the conversation out of Awaiting response without replying.

Opening a conversation does not mark it read. It stays in Awaiting response until someone replies, marks it read, or marks it not interested, so nothing gets dropped just because somebody looked at it.

Not interested and opt-outs

Click Not interested in the header to move a conversation to the Not interested tab and stop texting that number.

If a crew member texts STOP, the conversation moves there on its own. The reply box is replaced with a notice that the recipient has opted out, and CrewSheet won't send them messages.